PVI Software Banner
Home Products & Services Drilling Software Cementing Job PlugPRO

PlugPRO - Cement Plug PlacementPlugPRO - Cement Plug Placement Model

  • Overview
  • Features
  • Resources
  • Specification

Ensure well integrity, minimize contamination, and reduce costs with PlugPRO’s advanced pump-and-pull simulation and accurate fluid displacement & Contamination Analysis.

Setting a cement plug on the target zone either creates a solid seal to stop fluid movement or provides a kick-off point for sidetrack drilling operations. However, traditional cementing methods often lead to fluid contamination and inefficiencies, resulting in costly remedial work and downtime.

Pegasus Vertex—A LINQX company developed PlugPRO to model displacement hydraulics and simulate fluids contamination during pipe pull out of hole (POOH). By optimizing the pumping schedules, PlugPRO minimizes contamination, ensuring a high-quality cement plug and enhancing wellbore integrity.

Watch PlugPRO in action. See how PlugPRO models fluid displacement and stimulates contamination during POOH.

Key Benefits:

  • Precision & Reliability: Achieve optimal cement plug placement every time with PlugPRO’s advanced simulations.
  • Pump-and-Pull Optimization: Master the pump-and-pull method for deviated and horizontal wells—minimize contamination and improve well integrity.
  • Cost Savings & Efficiency: Cut operational costs by reducing contamination and improving cement job success rates..
  • Enhanced Well Integrity: Strengthen well integrity with optimized displacement hydraulics and contamination control.
  • Data-Driven & User-Friendly: Empower your team with easy-to-use simulations and clear reports—no guesswork required.

Want to understand how PlugPRO simulates cement plug temperature during POOH? Read our expert insights and discover how the "Pull and Pump" feature ensures accurate plug setting.

Discover how our pump-and-pull mehtod enhances cement plug quality and reduces contamination.

  • Optimize fluid volume to balance slurry and spacer levels
  • Under-displacement volume calculation
  • Customized pumping schedule
  • Fluid contamination after pulling pipe out of the hole (POOH)
  • ECDs and pressure
  • Hydraulics calculation
  • Circulating temperature simulation
  • Displacement and POOH animation
  • Hook load during displacement
  • Microsoft Word® report
  • Oil field, SI, and customized units
  • Operating Systems

    • Microsoft Windows® 10 or above
  • Microsoft Office®

    • 2016 or above
  • Processor

    • Dual core processor, 1.4 GHz or higher. Not compatible with ARM processor
  • Memory

    • 4 GB RAM
  • Disk Space

    • 200 MB of free disk space for installation
  • Display

    • 1,280 x 768 display resolution
  • Installation Options

    • Setup file can be accessed from a download link or installation CD provided by PVI